winter pile installation – winter screw pile installation from GlavFundament in Novosibirsk. Site clearing, marking, screwing, shaft concreting. Verticality and depth control are especially important
screw piles Novosibirsk – screw piles in Novosibirsk from a trusted contractor. We work on complex soils, with elevation changes and high groundwater levels. In-house pile production with anti-corrosion coating
field pile load testing – pile load testing for private and industrial facilities in Novosibirsk. Accurate data for foundation design. Timelines from 2 to 5 days
field pile load testing – field pile load testing is carried out according to GOST 5686-2020. It determines pile bearing capacity and soil resistance. Mandatory for engineering surveys in Novosibirsk
geological surveys for foundation – geology for a foundation in Novosibirsk on a turnkey basis. Official report with recommendations on the foundation type. We work with any complexity category
soil investigation before construction – geological surveys before construction for private houses and commercial facilities in Novosibirsk. Modern equipment, experienced specialists. Accurate results
soil investigation before construction – soil investigation before construction from GlavFundament. We identify heaving soils, weak soil lenses and water level. The report is passed to the design department
pile foundation installation – order a turnkey pile foundation in Novosibirsk. In-house pile production, own fleet, experienced crews. Free engineer site visit
geological surveys for foundation – engineering-geological surveys for a foundation are carried out according to SP 47.13330. Boreholes, laboratory tests, geological cross-section
pile foundation installation – turnkey screw pile foundation with a 25-year warranty. Mandatory control screwing, geodetic control. Shaft and head concreting